Monday 6 November 2017

WEEK 14: Create the poster and preparation for Industry Day

Date: 6- 10/11/2017 (Monday- Friday)
Activity: Create the poster and preparation for Industry Day
Objective: To make a preparation and practice on the presentation for UniKL BMI Industry Day
Contents: 

We designed a poster which is required during our presentation of the project on Industry Day next week. All the contents in the poster we take from our draft proposal report. Then, we submit the final poster to our supervisor to check the contents of poster.
We also practiced what we are going to present during the presentation and at the same time we get some consult from Madam Norhaslinawati for our project preparation.
The poster needs to have:
·        Project title 
·        Student's name
·        Course
·        Objectives
·        Product Description
·        Flow Chart
·        Methodology
·        Result & Analysis
·        Conclusion 
·        References

Results/Analysis:


Poster for presentation

Conclusion: 
In conclusion, Madam Norhaslinawati had corrected some details on the poster. After get the consultation from our supervisor we are now prepared to present our project for next week.

No comments:

Post a Comment